AnjaneyaVENTURES — home

Five families

Not sure where to begin?

One survey covers every system on the site, then an itemised quotation.

All fourteen disciplines Guwahati · Assam · Northeast India
Book a site survey +91 70025 07043

2nd Floor, Saraswati Apartment, Chilarai Nagar Path, Bhangagarh, Guwahati 781005

For government & public sector

Systems built to be accounted for.

Public money buys equipment that someone will later have to find, count and explain. Every system we hand over comes with a device list, a cable schedule and configuration notes the office keeps.

The brief we usually hear

Sound familiar?

Audit will ask what was installed, and where.

Two years after purchase, someone has to match an invoice line to a camera on a wall. That only works if the device list gives the make, model, serial number and location of every unit.

The officer who ordered it will be transferred.

Postings change faster than equipment does. The system has to make sense to the next officer, clerk and contractor without a call to whoever installed it.

Our office is a long way from any service centre.

A district or hill office cannot wait a week for someone to look at a blank monitor. Staff need equipment they can restart, spares that match, and a clear way to log the fault.

Things we plan around

Specific to your sector.

01

Documentation is part of the deliverable

At handover the office receives a device list, a cable schedule and configuration notes, and its users are trained. Administrator access should sit with the office rather than one officer, and the notes should record who holds it.

02

Old buildings, new cable

Many public buildings have masonry walls, high ceilings and nowhere to hide a cable. Surface conduit is run so it looks deliberate, and Wi-Fi is planned room by room because thick masonry absorbs signal.

03

Power that cannot be trusted

Voltage fluctuation and long power cuts are routine in many district towns. Recorders, switches and servers need a UPS, sound earthing and surge protection, or the first monsoon storm finds the weak point.

04

Cameras in public spaces

People visiting a public office should be able to see that they are being recorded. Signage, camera angles that avoid private areas, a named list of viewers and a written export procedure all belong in the plan.

For procurement teams

Itemised quotations, GST invoices and a labelled, documented installation. Tell us what your process needs and we’ll confirm what we can provide.

Clients on record · Government & public bodies

Dima Hasao Autonomous CouncilForest Department AssamSoftware Technology Parks of India, GangtokSoftware Technology Parks of India, GuwahatiSoftware Technology Parks of India, Kohima

Systems differ from site to site.

Questions

Asked and answered.

What documents do you hand over at the end of a government project?

You receive a device list, a cable schedule, configuration notes and training for the staff who will run the system. The device list records each unit’s make, model, serial number and location, for checking against invoices and the asset register. GST invoices are issued for both supply and installation.

Can you quote against our department’s specification or bill of quantities?

Yes. Share the specification or bill of quantities with your survey request, and the itemised quotation can follow its line items. If the site calls for a different cable route, camera position or device, the quotation sets out the reason. The file then shows why anything changed.

Do you work with district and hill offices outside Guwahati?

We work across Assam and the wider Northeast from our base in Bhangagarh, Guwahati. Distant offices need more planning at survey stage. Standardising equipment across offices lets spares interchange, and staff are trained to handle simple restarts. Faults can be raised and tracked through our customer portal, so nobody waits for a visit just to report one.

How long can CCTV footage be kept for an inquiry or audit?

As long as the recorder’s storage allows, and that is sized at design stage to the department’s retention policy. Recording days, camera resolution and the amount of movement each camera sees together decide the disk size. Clips needed for an inquiry should be exported and kept separately, since the recorder overwrites its oldest footage when full.

Can you supply desktops, printers and other IT hardware?

IT hardware can be supplied on its own or as part of a larger fit-out. Every desktop, laptop and printer is quoted item by item and invoiced with GST. Their serial numbers go onto the device list, ready for the office’s asset register from the first day.

Who maintains the system after handover?

We can, under an annual maintenance contract whose scope is agreed for your site. Existing customers can raise and track service requests through our customer portal at crm.anjaneya.ventures/service. Our team usually replies within one working day. Each request stays on record, so a department can later show when a fault was reported.

Walk your site with us.

One visit, then an itemised quotation for the systems your government office needs.

WhatsApp usOur team usually replies within one working dayCall us+91 70025 07043

Site survey

Let’s walk your site.

Tell us where it is and what it needs to do. We’ll call to fix a time, walk the site, then send an itemised quotation.

Type of site (required)
Systems you’re considering (required) choose one or more
Timeline
Preferred time for the visit
Best way to reach you
  • Our team usually replies within one working day.
  • Your details are used only to answer this request and are never sold.

By sending this you ask us to contact you about it; it doesn’t subscribe you to marketing. See the privacy notice.