AnjaneyaVENTURES — home

Five families

Not sure where to begin?

One survey covers every system on the site, then an itemised quotation.

All fourteen disciplines Guwahati · Assam · Northeast India
Book a site survey +91 70025 07043

2nd Floor, Saraswati Apartment, Chilarai Nagar Path, Bhangagarh, Guwahati 781005

06 · Entrance Automation

Automatic gates that know when to stop.

Entrance automation for sliding gates, swing gates and boom barriers, planned around traffic, power cuts and the monsoon.

Where it’s used

Homes, housing societies, school and hospital entrances, office campuses, factory yards

Typical systems

Sliding and swing gate motors, boom barriers, photocells, loops, remotes, RFID readers

How we work

Gate, traffic and power surveyed before an itemised quotation

See it work

A better way in and out.

Send a car through the barrier, put something in the gate's path, cut the power. Safe entrances are designed for the bad day.

What’s included

The whole job, not just the box.

  • Sliding and swing gate motors

    Operators sized to the leaf and its daily use, from a home gate to a busy campus entrance.

  • Boom barriers

    Arms matched to lane width and headroom, including articulated arms for low basement entries.

  • Layered safety

    Photocells across the opening, safety edges on the leaf, force limiting and a flashing warning lamp.

  • Vehicle loops

    Inductive loops in the road surface that hold a barrier up over a car and lower it once the lane clears.

  • Ways to open

    Rolling-code remotes, keypads, RFID cards or windscreen tags, a gate intercom, or app control where the gate has a reliable signal.

  • Power-cut planning

    A manual release your staff have practised, plus battery backup or an inverter feed where the gate cannot wait.

  • Monsoon detailing

    Control boxes above standing water, sealed conduit and sliding tracks laid so silt and rain drain away.

How we plan it

Start with the traffic, not the motor.

A society gate at 9 pm and a hospital entrance at visiting hours make very different demands. The motor is chosen last, after the gate, the traffic, the power and the ground.

Plan it with us
01

Is the gate ready for a motor?

No motor can fix a gate that drags. Before anything is ordered, the gate should swing or slide smoothly by hand, on sound hinges, true rollers and a straight track. Its weight, length and frame strength set the operator size. Bent frames, sagging leaves and rusted rollers are repaired first. Otherwise the motor strains, the safety settings drift and the gate fails early.

02

How busy is the entrance, and when?

Home gates move a handful of times a day. School gates at drop-off and factory gates at shift change may move every minute. Busy entrances need an operator rated for frequent use and an auto-close timed to the traffic. Pedestrians need their own wicket gate, away from the moving leaf. Ambulances and fire tenders need a way to hold it open.

03

What stops the gate on a person or a car?

Several layers, because no single sensor sees everything. Photocells across the opening stop or reverse the gate when the beam is broken. Safety edges on the leaf react to contact. The controller limits motor force and reverses on resistance. On boom barriers, a loop under the arm keeps it raised over a vehicle. Before movement starts, a flashing lamp warns everyone.

04

Who opens it, and how?

Match the method to the user. Residents and staff do well with rolling-code remotes or UHF RFID windscreen tags that open the gate as the car approaches. Keypads suit staff on foot. App or GSM control helps when someone must open the gate from elsewhere, but it relies on a mobile or Wi-Fi signal. Visitors are better handled by an intercom or the guard than by shared codes.

05

What will power cuts and the monsoon do?

Plan for both from the start. Gate operators include a manual release that disengages the gearbox. Hospitals and busy societies usually need battery backup or an inverter feed as well. Voltage swings and lightning damage control boards, so earthing and surge protection are worth specifying on exposed gates. Sliding tracks need drainage, and below-ground swing motors suit only drives that never flood.

How a project runs

Five steps, survey to handover.

Survey, design, installation and handover are planned as one job, so nothing is lost between stages.

  1. 01

    Survey

    We work the gate by hand, measure space and slope, check the supply and watch the entrance in use.

  2. 02

    Design

    Operator, safety devices and opening methods are chosen together and set out in an itemised quotation.

  3. 03

    Install

    Track or brackets, motor, photocells and loops go in square and level, with cabling in conduit, labelled and documented.

  4. 04

    Commission & train

    Limits, force and auto-close are set, each safety device is tested on a moving gate, and guards practise the manual release.

  5. 05

    Care

    Under an AMC, rollers, track, sensor alignment and batteries are checked to an agreed scope; service requests go online.

What drives the cost

Priced after the survey.

Two sites with the same number of devices can cost very differently. These are the things that decide it. The survey measures them; the itemised quotation follows.

  • 01Gate weight, length and condition, and repairs before motorising
  • 02Operator type and duty rating: sliding, swing or boom barrier
  • 03Safety devices: photocells, safety edges, loops and warning lamps
  • 04Opening method: remotes, keypads, RFID tags, intercom or app
  • 05Battery backup, cable distance from the supply and surge protection
  • 06Civil work: track laying, plinths, loop cutting and making good the drive

After handover

Gates rarely fail all at once. A roller wears, a photocell drifts, a battery loses charge, silt builds in the track. An annual maintenance contract can be arranged to catch these early, with scope agreed per site. Existing customers raise and track service requests at crm.anjaneya.ventures/service. Our team usually replies within one working day.

Questions

Asked and answered.

Sliding or swing gate motor: which should I choose?

Choose sliding where a clear run of wall sits beside the opening, and swing where there is a clear arc behind it. A sliding gate needs run-back space slightly longer than the opening and a level track. Swing gates suit narrow plots but struggle on a rising drive, and wide solid leaves catch the wind.

Can I open an automatic gate by hand during a power cut?

Yes. Gate operators have a manual release, usually a key or lever, that disengages the gearbox for pushing by hand. Keep the key where the guard can reach it. For long cuts, specify battery backup or an inverter feed. Re-engage the motor when power returns, or the gate will not close itself.

Do I need photocells if the motor has obstacle detection?

You do, because the two do different jobs. Obstacle detection reacts only after the gate has touched something. Photocells see a person, pet or car in the opening before contact. Busy or public entrances benefit from both, plus a safety edge on the leaf. Test the photocells regularly by breaking the beam as the gate closes.

Can the gate open from my phone?

It can, with a Wi-Fi or GSM module added to the operator. It lets you admit a delivery or a relative while away. App control depends on network coverage at the gate, so keep remotes or tags for everyday use. Limit access to named users, and remove them when staff or tenants leave.

Can you automate our existing gate?

Usually, yes, if the gate moves smoothly by hand and its frame can carry a motor. Older gates often need small repairs first: new rollers, a straightened track, re-aligned hinges or extra bracing. The survey checks this, and any repairs appear as separate lines in the quotation.

How often does a gate or boom barrier need servicing?

It depends on use: a busy society gate or boom barrier needs attention far more often than a home gate. Between visits, staff can clear the track, wipe photocell lenses and report changes in sound or speed. An annual maintenance contract can be arranged, with scope agreed for your site.

Which areas do you cover, and is the work GST-invoiced?

We work across Guwahati, Assam and the wider Northeast, and sales and projects are invoiced with GST. A site survey comes before the itemised quotation, because gate condition, space and power differ on every site. Equipment can also be quoted on its own. Our team usually replies within one working day.

Walk your site with us.

One visit to see the entrances, cable routes, power and the people who’ll use it. Then an itemised quotation.

WhatsApp usOur team usually replies within one working dayCall us+91 70025 07043

Site survey

Let’s walk your site.

Tell us where it is and what it needs to do. We’ll call to fix a time, walk the site, then send an itemised quotation.

Type of site (required)
Systems you’re considering (required) choose one or more
Timeline
Preferred time for the visit
Best way to reach you
  • Our team usually replies within one working day.
  • Your details are used only to answer this request and are never sold.

By sending this you ask us to contact you about it; it doesn’t subscribe you to marketing. See the privacy notice.