AnjaneyaVENTURES — home

Five families

Not sure where to begin?

One survey covers every system on the site, then an itemised quotation.

All fourteen disciplines Guwahati · Assam · Northeast India
Book a site survey +91 70025 07043

2nd Floor, Saraswati Apartment, Chilarai Nagar Path, Bhangagarh, Guwahati 781005

14 · Weighbridge Solutions

Every load, on record.

Weighbridge supply, installation and integration for industry, logistics and mining sites.

Where it’s used

Factories, warehouses, logistics yards, quarries and mining sites

Typical systems

Deck, load cells, indicator, software, ticket printer, CCTV

How we work

Sized to the vehicle mix, planned for monsoon drainage

See it work

One record, start to finish.

Weigh a truck in and out, or follow an order from enquiry to GST invoice. The record is made once and travels with the work.

What’s included

The whole job, not just the box.

  • Pit or pit-less foundation

    Foundation type chosen for your ground, water table and drainage, coordinated with whoever does the civil work.

  • Deck and load cells

    Platform length and capacity matched to the longest and heaviest vehicles, on load cells chosen for the duty.

  • Indicator and cabling

    A weight indicator the operator can read at a glance, with load-cell cables protected from water, rodents and wheels.

  • Weighing software and tickets

    Gross, tare and net recorded against vehicle number, material and party, with printed tickets and searchable records.

  • CCTV at the weighbridge

    Cameras on the number plate and the deck, with images saved against each weighment where the software supports it.

  • Gate and ERP integration

    Weighment data passed to your ERP or accounts where both systems allow it. Boom barriers or RFID readers added where the gate needs them.

  • Calibration and verification

    Calibrated against test weights, then presented for Legal Metrology verification and stamping.

How we plan it

Size it for the trucks, not the brochure.

A weighbridge stays put for many years once laid, so these decisions are worked through on site.

Plan it with us
01

Pit or pit-less?

A pit-type bridge sits flush with the ground, so vehicles drive straight on without ramps. It needs a dug foundation, reliable drainage and regular cleaning, which matters through a Northeast monsoon. A pit-less bridge sits above ground on a concrete base, with a ramp at each end. It drains easily and is simpler to inspect, but its ramps need extra straight length at both ends.

02

How long a deck, and what capacity?

The deck should hold your longest vehicle in one weighment, with every axle on the platform. Capacity should sit comfortably above the heaviest loaded vehicle, not at its limit. List the vehicle mix as it really is: tippers, multi-axle trucks, trailers, tractors and pick-ups. Higher-capacity bridges usually read in coarser steps, which matters if light vehicles are common on your site.

03

Which load cells and indicator?

Load cells carry the whole weight and sit closest to water, mud and lightning surges, so they decide long-term accuracy. Digital and analogue cells both work; the choice affects fault finding, cabling and cost. The indicator should be easy to read and send readings reliably to the computer. On open sites, earthing and surge protection belong in the design. The indicator, computer and printer also need a UPS, so a power cut does not stop a weighment halfway.

04

What should each ticket and record hold?

At minimum, a ticket number, vehicle number, gross, tare, net, date and time. Most sites add material, party, challan or order number and the operator's name. Decide early whether tickets print in duplicate or triplicate, and who keeps each copy. Records should be searchable by vehicle and date and exportable to accounts, so disputes are settled from data rather than memory.

05

Where should the cameras go?

Most weighbridges need at least two views: the number plate and the full deck. The deck view shows every wheel on the platform and nobody standing on it. A third camera on the operator's desk records the indicator and the ticket being issued. Night lighting, rain and headlight glare are planned for, because many yards and quarries keep weighing well after dark.

How a project runs

Five steps, survey to handover.

Survey, design, installation and handover are planned as one job, so nothing is lost between stages.

  1. 01

    Survey

    We walk the approach, turning space and proposed position with your yard manager. Vehicle mix, peak hours, ground, drainage and power are noted.

  2. 02

    Design

    Foundation type, deck size, capacity, load cells, software and camera positions are agreed with you, then priced in an itemised quotation.

  3. 03

    Install

    Civil work for the foundation is coordinated with your contractor. Load cells are set and levelled, the deck goes on top, and every indicator cable is protected and labelled.

  4. 04

    Commission & train

    Calibration against known test loads comes first, then the Legal Metrology verification visit. Operators are trained on first and second weighments, tickets and daily checks.

  5. 05

    Care

    Service requests go through the customer portal. An AMC can include periodic checks of cabling, drainage, software and cameras, with scope agreed per site.

What drives the cost

Priced after the survey.

Two sites with the same number of devices can cost very differently. These are the things that decide it. The survey measures them; the itemised quotation follows.

  • 01Capacity and deck length for your vehicle mix
  • 02Pit or pit-less foundation, with the civil and drainage work it needs
  • 03Load cell type and number, indicator and junction box
  • 04Weighing software, ticket printer and integration with your ERP or accounts
  • 05CCTV, boom barriers or RFID for unmanned or busy gates
  • 06Site access and distance, plus verification and stamping fees

After handover

After handover, existing customers raise and track service requests online through the Anjaneya customer portal at crm.anjaneya.ventures/service. When a weighbridge stops weighing, dispatch usually stops too. Report faults with the indicator reading and the last ticket number. An annual maintenance contract can be arranged, with scope agreed per site. Periodic Legal Metrology re-verification is a separate statutory step. Our team usually replies within one working day.

Equipment we supply

A listing means we supply the brand; it is not a claim of authorised partnership. We recommend the model that suits the site.

DascomEpsonCP PLUSPrama

Questions

Asked and answered.

What size weighbridge do I need?

Pick a deck long enough for your longest vehicle in one weighment, and a capacity comfortably above your heaviest loaded vehicle. Space for the approach and for turning matters as much as the bridge itself. Both are measured at the survey before a size is quoted.

Is a pit-type or pit-less weighbridge better in heavy rain?

Pit-less is usually easier to keep dry, because water drains away from the base instead of collecting under the deck. A pit-type bridge can work well through the monsoon if the pit has proper drainage and is cleaned regularly. Ramp space and the water table also shape the choice.

Who carries out Legal Metrology verification and stamping?

Verification and stamping are carried out by the Legal Metrology department, not by Anjaneya Ventures. The weighbridge is installed and calibrated first, and the department's requirements are confirmed before the visit. Weighbridges used for trade also need periodic re-verification, so note the due date at handover. Department fees, where they apply, are listed separately in the quotation.

Can weighbridge records go into our ERP or accounts?

Usually, yes. Weighment records can be exported to ERP and accounting software, so dispatch, billing and stock use the same net weight. The method depends on both systems, so compatibility is checked with a sample before it is quoted. One shared figure also speeds month-end reconciliation with parties.

How long does a weighbridge installation take?

The timeline is set after the survey, because the foundation decides most of it. A pit-type bridge needs excavation, drainage and concrete that must cure before the deck goes on. A pit-less base needs less digging but must still cure. Equipment availability, monsoon weather and the Legal Metrology visit also move the date, so each stage is listed in the quotation.

Can you upgrade an existing weighbridge with software or cameras?

Often, yes. Many older bridges still rely on a handwritten register. If the indicator has a serial output, it can usually feed new weighing software. CCTV, a ticket printer, RFID readers or boom barriers can then be added around it. We check the indicator's model and condition at survey before promising anything.

What affects the cost of a weighbridge?

Capacity, deck length and foundation type move the cost most, followed by load cells, indicator and software. Civil work, drainage, distance, CCTV, barriers and stamping fees add to it. An itemised quotation follows the survey, and the sale and installation are invoiced with GST.

Walk your site with us.

One visit to see the entrances, cable routes, power and the people who’ll use it. Then an itemised quotation.

WhatsApp usOur team usually replies within one working dayCall us+91 70025 07043

Site survey

Let’s walk your site.

Tell us where it is and what it needs to do. We’ll call to fix a time, walk the site, then send an itemised quotation.

Type of site (required)
Systems you’re considering (required) choose one or more
Timeline
Preferred time for the visit
Best way to reach you
  • Our team usually replies within one working day.
  • Your details are used only to answer this request and are never sold.

By sending this you ask us to contact you about it; it doesn’t subscribe you to marketing. See the privacy notice.