AnjaneyaVENTURES — home

Five families

Not sure where to begin?

One survey covers every system on the site, then an itemised quotation.

All fourteen disciplines Guwahati · Assam · Northeast India
Book a site survey +91 70025 07043

2nd Floor, Saraswati Apartment, Chilarai Nagar Path, Bhangagarh, Guwahati 781005

01 · Networking Infrastructure

The network every other system stands on.

Networking infrastructure for Guwahati and the Northeast: cabling, switching, racks and Wi-Fi, planned from a walk of your site.

Where it’s used

Offices, campuses, hospitals, hotels, warehouses and plants

Typical systems

Cat6 and Cat6A copper, fibre, managed PoE switches, racks, Wi-Fi

How we work

Survey first, itemised quote, labelled and documented install

See it work

Power on. Everything answers.

Switch the rack on, then cut the mains. With a correctly sized UPS, cameras, phones and access points keep running through a power cut.

What’s included

The whole job, not just the box.

  • Site survey

    Floors, ceiling voids and risers walked to find cable routes, rack positions and the walls Wi-Fi must cross.

  • Structured cabling

    Cat6 or Cat6A to desks, cameras and access points, terminated on patch panels and labelled.

  • Fibre backbone

    Between racks, floors and separate blocks, wherever distance makes fibre the better choice.

  • Switching and PoE

    Managed switches with the PoE budget to power cameras, phones and access points, and spare ports for growth.

  • Wi-Fi

    Ceiling access points placed from the survey, with staff, guest and device networks kept apart.

  • Racks and power planning

    Wall-mount or floor racks with cable managers, and UPS backup planned for the core equipment.

  • Documentation

    A port map, device list and configuration notes, so the next fault is traced rather than guessed.

  • Support after handover

    Service requests through the customer portal, and an AMC on a scope agreed for your site.

How we plan it

Good networks are settled before the first cable.

Slow Wi-Fi in one wing, a camera that drops at night, a switch nobody can find. Most trace back to installation day. Five decisions, settled with you at survey, prevent most of them.

Plan it with us
01

What will the network carry in three years?

Start with people and devices, not cable. Count desks, then add cameras, IP phones, biometric terminals, printers, billing counters and access points. Buildings gain devices faster than staff. Switch ports, PoE budget and uplinks are sized to the plan you describe, with spare capacity agreed up front. A dozen more cameras next year should not mean a new core switch.

02

How far is each outlet from a switch?

Copper Ethernet is limited to about 100 metres per channel, patch cords included. On a long factory floor or a hospital with several wings, that limit decides where racks go. A main rack with smaller floor racks, joined by fibre, usually beats stretched copper. Between buildings, fibre carries light, not current, so a surge in one block is far less likely to reach the next.

03

Which walls will the Wi-Fi have to pass through?

Walls shape Wi-Fi, so it is planned room by room. RCC slabs, lift cores, tinted glass and steel racking all weaken signal. The 2.4 GHz band reaches further; 5 GHz carries more traffic but fades faster through masonry. A classroom block, a hotel floor and a warehouse aisle each need their own layout. Access points go where people use them, not along corridors.

04

Which traffic should never share a lane?

Guests on hotel or campus Wi-Fi should never see your accounts PC, and a camera stream should not slow a billing counter. Managed switches divide one network into VLANs for office, voice, CCTV, guest and building devices. A firewall at the edge controls what may pass between these networks and the internet. This is simple at installation and awkward to retrofit.

05

Where will the rack live, and what keeps it running?

A rack in a damp stairwell or beside a pantry sink tends to fail early, especially through a Guwahati monsoon. It belongs somewhere dry, ventilated and lockable, with sound earthing and its own power point. Then decide how long the network must run in a power cut, and size the UPS to that. Where voltage swings, choose a UPS with built-in regulation.

How a project runs

Five steps, survey to handover.

Survey, design, installation and handover are planned as one job, so nothing is lost between stages.

  1. 01

    Survey

    We walk the building with whoever knows it: rack room, ceiling voids, risers, outdoor runs and the rooms where Wi-Fi matters.

  2. 02

    Design

    Outlet, switch and access-point positions, VLANs and backup time are agreed with you, then priced in an itemised quotation.

  3. 03

    Install

    Cable goes into conduit or trunking and terminates on labelled patch panels. Racks are dressed so every lead can be traced.

  4. 04

    Commission & train

    Each link is tested and the switches and Wi-Fi configured. Your team then learns the port map, the guest network and safe restarts.

  5. 05

    Care

    Faults and additions go through the customer portal. An AMC can cover switches, Wi-Fi and the rack on an agreed scope.

What drives the cost

Priced after the survey.

Two sites with the same number of devices can cost very differently. These are the things that decide it. The survey measures them; the itemised quotation follows.

  • 01Number of outlets, cameras and access points to cable
  • 02Cable distances, ceiling heights, and conduit, trunking or concealed runs
  • 03Copper or fibre backbone, and any runs between buildings
  • 04Switch count, PoE budget and spare ports
  • 05Wi-Fi density: open coverage versus crowded rooms
  • 06Existing cabling and equipment that can be reused

After handover

After handover the network keeps changing: a new floor, more cameras, a second internet line. Existing customers raise these requests, and any fault, through the customer portal at crm.anjaneya.ventures/service, and track each one there. Our team usually replies within one working day. Because the original design is documented, additions follow it instead of working around it. Planned upkeep can sit under an annual maintenance contract.

Equipment we supply

A listing means we supply the brand; it is not a claim of authorised partnership. We recommend the model that suits the site.

CiscoHP ArubaNetgearTP-LinkD-LinkDigisol

Questions

Asked and answered.

Should we use Cat6, Cat6A or fibre?

Usually a mix of copper and fibre. Cat6 suits desks, cameras and most access points at gigabit speed. Cat6A earns its place where links may need 10 Gb/s over the full 100-metre channel; Cat6 manages that only on shorter runs. Fibre carries the backbone: between racks, along long floors and between buildings. A small single-floor office may need copper alone.

How many Wi-Fi access points will our building need?

Your walls and your peak crowd decide the number, not floor area alone. An open-plan office may need fewer access points than an RCC classroom block of the same size. A lecture hall needs capacity as well as coverage. The survey maps rooms, materials and busy-hour users, and the quoted count follows that map.

Can you fix patchy Wi-Fi on a network someone else installed?

Usually, yes, and often without rewiring. Patchy Wi-Fi tends to come from too few access points, home routers chained as repeaters, or one router covering several floors. We test where the signal drops and keep whatever cabling and switches are sound. The itemised quotation then covers only what needs changing.

Will work have to stop while the network goes in?

Not usually. Cabling can be phased floor by floor, with the final switch-over planned with you for a quieter time. Duration depends on the number of outlets, ceiling access and any wall chasing or civil work. The timeline is agreed before work starts, so each department knows when its area is affected.

What happens to the network during a power cut?

It runs only as long as its UPS does, so backup time is worth deciding early. Switches, the router and PoE devices such as cameras, phones and access points all draw from that UPS. Decide which must stay up, and for how long. Your internet provider's equipment needs backup too, or the office goes offline anyway.

What does a network installation cost?

Your site sets the cost, so it is quoted after a survey. Outlet and access-point count, cable distances, conduit or trunking, the backbone, switch capacity and reusable equipment are the main drivers. You receive an itemised quotation, and every project is invoiced with GST.

Do you offer an AMC for the network?

Yes, an annual maintenance contract can be arranged, with the scope agreed for your site. Switches, Wi-Fi, the rack and UPS are the usual items to discuss. Existing customers log and track requests through the customer portal, and our team usually replies within one working day.

Walk your site with us.

One visit to see the entrances, cable routes, power and the people who’ll use it. Then an itemised quotation.

WhatsApp usOur team usually replies within one working dayCall us+91 70025 07043

Site survey

Let’s walk your site.

Tell us where it is and what it needs to do. We’ll call to fix a time, walk the site, then send an itemised quotation.

Type of site (required)
Systems you’re considering (required) choose one or more
Timeline
Preferred time for the visit
Best way to reach you
  • Our team usually replies within one working day.
  • Your details are used only to answer this request and are never sold.

By sending this you ask us to contact you about it; it doesn’t subscribe you to marketing. See the privacy notice.