AnjaneyaVENTURES — home

Five families

Not sure where to begin?

One survey covers every system on the site, then an itemised quotation.

All fourteen disciplines Guwahati · Assam · Northeast India
Book a site survey +91 70025 07043

2nd Floor, Saraswati Apartment, Chilarai Nagar Path, Bhangagarh, Guwahati 781005

05 · Safety Solutions

Early warning, on every floor.

Fire alarm, detection and life-safety systems, planned around how your building is used.

Where it’s used

Offices, hospitals, schools, hotels, warehouses and factories

Typical systems

Detectors, call points, hooters, alarm panels, door release and interfaces

How we work

Designed to the applicable codes; approvals confirmed with the authority

See it work

When the alarm sounds, doors let people out.

Trigger the fire alarm and watch the locks release for free exit. Detection, alarm and access are planned to work together.

What’s included

The whole job, not just the box.

  • Smoke detection

    Optical smoke detectors for offices, corridors, wards, guest rooms and stores, where fires tend to smoulder first.

  • Heat detection

    Heat detectors where smoke heads would false-alarm: fixed-temperature types in kitchens and generator rooms, rate-of-rise in dusty stores.

  • Manual call points

    Call points on escape routes and beside exits, so anyone who sees a fire can raise the alarm.

  • Hooters and visual alarms

    Sounders planned to reach every occupied area, with flashing beacons where noise makes sound alone unreliable.

  • The fire alarm panel

    A conventional or addressable panel with standby batteries, sited where reception or security staff will see and hear it.

  • Door release on alarm

    Access-controlled doors on escape routes wired to unlock when the alarm activates, with break-glass release beside them.

  • Labelled zones and records

    Devices labelled by zone and documented, so anyone at the panel can tell where an alarm came from.

How we plan it

The code sets the minimum. Your building sets the rest.

Design must follow the applicable codes, such as the National Building Code of India and IS 2189. Your consultant or the fire authority confirms what applies. Within those rules, five decisions shape a system people trust.

Plan it with us
01

Which detector suits each room?

Match the detector to the room's normal air. Optical smoke detectors suit offices, corridors, wards and bedrooms. Kitchens, generator rooms, basement parking and dusty stores usually take heat detectors, because cooking fumes, exhaust and dust trigger smoke heads. Tall warehouses and atriums may need beam detectors. Choosing room by room is the main defence against false alarms, which teach people to ignore the hooter.

02

How should the building be zoned?

Zones tell responders where to go. On a conventional system, each zone usually covers one floor or wing, and the panel narrows an alarm to that zone. An addressable system names the exact device, such as a smoke detector in a second-floor store room. Larger and multi-building sites usually justify addressable panels. Smaller, simpler buildings often work well with conventional zoning, at lower cost.

03

Where do call points and hooters go?

Call points belong on escape routes, at storey exits and beside final exits, at a height anyone can reach. Hooters must be heard in every occupied area, including washrooms, plant rooms and closed cabins. In noisy production halls, or for people with hearing loss, flashing beacons add a visual alarm. Exact spacing and sound levels come from the code and your consultant.

04

What else should respond to the alarm?

A fire alarm does most good when the building reacts with it. Doors on access-controlled escape routes should release, so nobody is held behind a reader. Air-handling units can stop to slow smoke moving through ducts. Background music can mute so evacuation tones are clear, and barriers can lift for fire tenders. Each interface is agreed with your consultant and tested before handover.

05

How will it cope with power cuts and the monsoon?

The panel runs on mains, with batteries sized for the standby and alarm periods the design specifies. Frequent power cuts and voltage fluctuation make healthy batteries essential, not optional. Humidity and dust affect detectors across the Northeast, especially in basements, kitchens and unconditioned stores, so periodic cleaning matters. Cable joints belong in sealed boxes, away from roof leaks and damp walls.

How a project runs

Five steps, survey to handover.

Survey, design, installation and handover are planned as one job, so nothing is lost between stages.

  1. 01

    Survey

    We walk every floor with the drawings, noting room use, ceiling voids, escape routes and where the panel will be watched.

  2. 02

    Design

    Detector types, call points, hooters, zoning and interfaces are set against the code and your consultant's specification, then itemised in a quotation.

  3. 03

    Install

    Alarm cabling runs on its own route in the specified cable. Devices are mounted and labelled by zone.

  4. 04

    Commission & train

    Detectors, call points, hooters and every interface are tested, including door release. Staff learn to read the panel, silence, reset and log faults.

  5. 05

    Care

    Periodic tests, battery replacement and detector cleaning keep the system trustworthy, under an AMC if you choose.

What drives the cost

Priced after the survey.

Two sites with the same number of devices can cost very differently. These are the things that decide it. The survey measures them; the itemised quotation follows.

  • 01Floor area, floors and how the space is divided
  • 02Number and type of detectors, call points and hooters
  • 03Conventional or addressable panel, and its battery standby
  • 04Cable routes, ceiling access and whether the building is occupied
  • 05Interfaces such as door release, AHU shutdown and music mute
  • 06Testing and documentation the specification calls for

After handover

Fire alarms that fault or false-alarm often are soon ignored, which defeats their purpose. Ongoing care means batteries replaced on time, detectors cleaned, and faults investigated rather than silenced. Service requests go through the online customer portal, and an annual maintenance contract can be arranged on agreed scope. Our team usually replies within one working day.

Questions

Asked and answered.

Which fire safety systems does my building need?

The building's use, height, floor area and occupancy decide it, under the National Building Code of India and local fire rules. Your architect, fire consultant or the fire authority confirms the requirement. Anjaneya plans and installs the detection and alarm part, from detectors to the panel and its interfaces. Sprinklers, hydrants and extinguishers are separate systems specified alongside it.

Who approves the fire alarm design?

Approval comes from the relevant authority, usually the fire service, often through your architect or fire consultant. An installer cannot grant it. The installation follows the specification and applicable codes, and test records are handed over for your files. Confirm the approval route, including any fire NOC, with your consultant before work starts.

Can the fire alarm release doors fitted with access control?

Yes, and on escape routes it should. A relay output from the panel cuts power to fail-safe locks, or signals the access controller to open them. Break-glass units beside the door add a manual backup. The link is tested during commissioning and recorded at handover, because it matters most on the day it is used.

Conventional or addressable fire alarm: which is better?

Neither is better everywhere; size and layout decide. Conventional panels report by zone, cost less and suit small, simple buildings. Addressable panels identify each device, so staff go straight to the right room. They also suit large buildings, with less cable per device. Hospitals, hotels and multi-floor offices often justify addressable. Your consultant's specification may already settle it.

How often should a fire alarm be tested and serviced?

Follow the schedule in the applicable code and your fire safety plan: routine user tests plus periodic servicing. A user test usually means operating a call point to confirm the panel and hooters respond. Servicing covers detectors, batteries, panel functions and interfaces. Keep a logbook of tests, faults and false alarms, since inspectors and insurers may ask for it.

Can a fire alarm be added to an existing building?

Yes. Retrofits are common in older offices, schools, hotels and shops. Cable routes are the main challenge, so surface conduit, ceiling voids and existing risers are mapped during survey. Work can be phased floor by floor to limit disruption in occupied buildings.

What decides the cost of a fire alarm system?

Device count and type, the panel and the cable routes decide most of it. Addressable devices cost more per point but can save cable on large floors. Interfaces such as door release or air-handling shutdown add modules and wiring. Pricing follows a survey, as an itemised quotation showing what each part adds.

Walk your site with us.

One visit to see the entrances, cable routes, power and the people who’ll use it. Then an itemised quotation.

WhatsApp usOur team usually replies within one working dayCall us+91 70025 07043

Site survey

Let’s walk your site.

Tell us where it is and what it needs to do. We’ll call to fix a time, walk the site, then send an itemised quotation.

Type of site (required)
Systems you’re considering (required) choose one or more
Timeline
Preferred time for the visit
Best way to reach you
  • Our team usually replies within one working day.
  • Your details are used only to answer this request and are never sold.

By sending this you ask us to contact you about it; it doesn’t subscribe you to marketing. See the privacy notice.